Feb 2009 - Stone and Squishy Stuff

We're getting so excited!!!




























































And so broke!
SmiliesFTW.com

The Shiny Stuff!

- Granite island top.


- More of the kitchen with shiny rock on top.


- Oopsie. The sink isn't going to fit there.


- Matter of fact, the sink is UNDERNEATH its' mounting place for now. :)


- Dishwasher. I'm getting tired of doing dishes in a one-bowl sink that's 2 square feet in diameter.


- Our new foyer light, safely away from any swinging doors.


- Stephanie's vanity; the middle area is the makeup table where she'll get pretty and stuff.


- Closeup of Stephanie's sink area.


- Joey's vanity area; complete with installer. SmiliesFTW.com


- Spare bathroom granite counter top and cabinet.

The Squishy Stuff!

Ooooh, the carpet is sooo soft!


- Carpet being layed in the master bedroom.




- Carpet laid on the steps.


- Threshold separating the master bathroom and the master bedroom.


- Plastic is layed down, since outside is still really muddy.





The Other Stuff!


- Our security light is up, can't wait to start feeling secure.


- Side lights on the garage.


- I can't get enough of this wall mount area for the bathroom... power and cable and a 19-inch LCD will be great.


- Laminate layed down in the washer/dryer room.


- Attic entry all trimmed up and looking good in the spare bedroom.


- The master bedroom light panel. The left switch is the light on/off with dimmer (sweet!) and the middle switch is the fan on/off with dimmer (it slows and speeds up the fan rotation, double sweet!)


- Threshold between the kitchen and the dining room.


- Caulking's all done on the shower. The master bedroom and the spare bathroom seem to be finished.

Well, still coming down to the wire... I heard the words 'punch list' during conversations with the builder, so expect a minor update soon.

- Joey
Powered By Blogger